Full Facility Shutdown | August 18 - September 10 Re-Opening September 11

Here’s a list of some of the work that will occur: • Converting existing underutilized muti-use facility space into a group cycle studio • All pool system preventative maintenance • Cosmetic upgrades and various painting throughout the facility • Fitness center preventative maintenance and replacement of two strength pieces • Equipment repair, including small portable items to fixed stationary systems

The annual maintenance shutdown is critical to keep the Maple Ridge Leisure Centre (MRLC) a valuable community asset. We focus on deep cleaning, safety improvements, inspections

and all pool mechanical systems. Thank you for your understanding!