2024 Annual Report-web FINAL
DEPARTMENT OVERVIEWS
Engineering
The Engineering department strategically plans and constructs infrastructure that prioritizes public health, safety, and the environment. Ensuring a high quality of living for the community and future generations, the team provides infrastructure planning and construction services for drinking water, sewage, drainage, and a multi modal transportation network.
2024 Highlights
Increased drinking water capacity at Dewdney Trunk reservoir by 6 million litres
Replaced 203 St. water main, upgraded Royal Cres. sanitary and Dewdney Trunk storm sewers
Established 64 water connections and 5 subdivision tie-ins
Added multi-use path, improved crosswalks and installed 21 flashing beacons and pedestrian signage
Engineering Operations
The Engineering Operations department monitors and maintains roads, sidewalks, signage, streetlights, traffic lights, City vehicle fleet, storm water management, water distribution, sewage collection, and conducts snow and ice control. Operations focuses on resident health and safety, while protecting the large investment in public works, underground infrastructure, and the environment.
2024 Highlights
Installed electrical kiosk for film industry
Purchased vacuum truck to clear catchbasins
Converted all streetlights to LED, reducing costs
Paved 23 kilometres of new road
28 | City of Maple Ridge - 2024 Annual Report
Made with FlippingBook Digital Proposal Maker