APPENDIX D: CAPITAL WORKS PROGRAM LISTING
$ in thousands
2018 2019 2020 2021 2022 6,912 6,543 3,310 4,395 4,775
Water
104 Ave Pipe Upsize
200
- - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - -
-
- - - - - - -
216 St 124 - 128 LTC017131 232 N of Abernethy PRV
-
650
550
- - - - - - - -
232 St 122 Ave to 124 Ave Watermain Replacement 232 St at 136 PS - 140m to 175m conversion 232 St DTR to 122 Ave Watermain Replacement 236 St PS CL Facility & Station Upgrade Concept Plan Phase 2
-
600
100 2,000
600 425
240 at Kanaka Way to 112
- -
280
240 St and 136 Ave W to Forest PS at Granite Way Construction 240 St and 136 Ave W to Forest PS at Granite Way Design
725
- -
100
263 St Reservoir Expansion Construction 263 St Reservoir Expansion Design
- - -
- 1,100
100
-
270A St Reservoir Replacement
- 1,500
84m Zone PRV Assess and Failure Contingency Planning Albion PS Improv (on 104 Ave at 245) Construction
100
-
- - - - - - - - - - - - - - - - - - -
- -
- 1,500
Albion PS Improv (on 104 Ave at 245) Design
150
- - - - - - - - - - - - - - - -
Albion Reservoir Expansion Phase 2
800
Ansell St (124 - 125)
-
360
CL2 Equipment Replacement Program
50 50
50
50
50
50
Dewdney Trunk (240 - 246)
DTR - 216 St to 222 St Watermain Replacement Construction DTR - 216 St to 222 St Watermain Replacement Design
- 1,500
100
DTR - Edge St to 228 St - Construction DTR - Edge St to 228 St - Design Dunn Ave (Maple Meadows Way - West St) Equip Purch - Water Truck Unit 46 Upgrade Equip Purch - Waterworks Department Truck Foreman Dr at 232 Street PRV Construction
-
715
50
-
250
25 45
450 150 200 250 400
Hydrant Flow Rates and Coding
Hydrant Installation
Local Area Service - Water McNutt PRV Replacement
250
250
250
250
Mitigating Risk of High System Pressures Post-Disaster Provision of Drinking Water
75
500 407
Private Water Connections
408
410
410
410
River Rd Seismic Event Automatic Isolation Valves (Concept Plan)
40
-
- -
- -
- -
SE of 136 and Foreman (connection to 84m Zone)
-
50
Seismic Upgrade Program
150
150
150
150
150
Town Centre Growth Study and Capital Investment (Water)
-
40
-
-
-